Find the Best Parking Lot Resurfacing Contractors for Your Business

No obligation • Fast responses • Nationwide coverage

Search providers near you

Top Parking Lot Resurfacing Contractors in South Jordan, Utah Ranked

Parking lot resurfacing is a critical maintenance procedure that restores a worn, cracked, or damaged asphalt surface, extending its life and improving safety and curb appeal. For property owners and managers in South Jordan, a properly executed asphalt overlay can transform a liability into a durable, functional asset for years to come. This guide details the local process, regulations, and best practices to help you understand your project and connect with qualified local paving professionals who can provide a tailored assessment and quote.

What is Asphalt Resurfacing?

Parking lot resurfacing, often called an asphalt overlay, is a process where the top layer of degraded pavement is removed and replaced with new hot-mix asphalt. Unlike a full reconstruction, which involves excavating down to the subgrade, resurfacing addresses surface-level issues like cracks, weathering, and minor irregularities, providing a cost-effective solution to extend pavement life by 8 to 15 years 1. In South Jordan, this typically involves milling off 1.5 to 3 inches of the existing surface before applying the new overlay, ensuring proper drainage and a flush finish with existing curbs and sidewalks 2.

The Step-by-Step Resurfacing Process

A successful overlay project follows a meticulous sequence. Understanding these steps can help you communicate effectively with contractors and know what to expect.

1. Site Inspection & Assessment

The process begins with a thorough evaluation. A professional will assess the condition of the existing asphalt, identify alligatored or cracked areas, and, most importantly, check the underlying base and drainage. Proper drainage is a non-negotiable standard in South Jordan, as standing water accelerates pavement failure. This inspection determines if the base is sound enough for an overlay or if more extensive repairs are needed first.

2. Milling and Grinding

Once the plan is set, specialized equipment mills or grinds off the designated depth of old asphalt-typically 1.5 to 3 inches in South Jordan projects. This step is crucial for creating a level surface that aligns with existing infrastructure like curb inlets and ensures the new pavement layer has a uniform thickness. The milled material is often recycled for use in other projects.

3. Base Repairs

Any underlying issues must be addressed before new asphalt is laid. This includes filling potholes and repairing compromised sections of the base layer. A stable, well-compacted base is vital for the longevity of the new overlay; skipping this step can lead to premature failure as problems in the base quickly reflect through to the new surface.

4. Tack Coat Application

A thin layer of liquid asphalt emulsion, called a tack coat, is sprayed onto the cleaned, milled surface. This sticky layer acts as a bonding agent, ensuring the new hot-mix asphalt adheres securely to the old pavement, creating a unified structural layer.

5. Asphalt Overlay Installation

Hot-mix asphalt is delivered at temperatures around 300°F and spread using a paving machine to the specified thickness, usually 2 to 3 inches for a parking lot overlay 3. The crew works quickly to place and roughly level the material before it begins to cool.

6. Compaction & Finishing

Heavy steel-wheel and pneumatic rollers compact the new asphalt in multiple passes to achieve maximum density, eliminate air pockets, and create a smooth, durable finish. Proper compaction is essential for strength and resistance to rutting and water infiltration.

7. Striping & Marking

Once the new asphalt has cured, the final step is re-applying pavement markings. This includes stall lines, directional arrows, fire lanes, and ADA-compliant handicapped stalls. All striping in South Jordan must comply with local ordinances and the Americans with Disabilities Act (ADA).

Find the perfect parking lot resurfacing contractors for your needs

Get personalized recommendations and expert advice

South Jordan Regulations and Permit Requirements

Adhering to local codes is not optional. South Jordan City has specific engineering standards that govern all pavement work.

  • Permits: A detailed parking plan must typically be submitted during the site plan approval or building permit process through the Development Services Department. Any work that connects to or impacts the public right-of-way (like a driveway apron) requires a separate permit 4.
  • Governing Standards: All construction must comply with the latest APWA (American Public Works Association) Manual of Standard Specifications, which South Jordan formally adopts. Contractors should be intimately familiar with this manual.
  • Drainage Compliance: Surface water runoff must be contained on-site. Drainage cannot be directed to flow across public sidewalks, and plans must ensure positive drainage away from structures to prevent ponding 5 6.
  • Engineering Approval: Any deviation from an approved site plan requires review and approval from the South Jordan City Engineering Department.
  • Inspections: The city requires inspections, including a final paving and landscaping inspection, before a certificate of occupancy can be issued for new developments or major renovations 7.

The Critical Role of Weather and Timing

Asphalt is a temperature-sensitive material, making timing a key factor for a successful project in Utah's climate.

  • Ideal Season: The best window for asphalt overlay in South Jordan runs from late spring through early fall (April/May to mid-October). During this period, ambient and ground temperatures are most reliable.
  • Temperature Requirements: Asphalt must be placed and compacted when the ambient temperature is above 50°F and rising. Cold ground pulls heat from the mix too quickly, preventing proper compaction and leading to raveling and premature cracks 8.
  • Moisture Concerns: Paving cannot occur during rain or if the underlying base is wet. A simple test: if footprints are visible in the gravel subbase, it is too wet to pave.
  • Winter Paving: It is strongly discouraged to pave when temperatures are below 40°F due to the high risk of compaction failure. The local frost line, which reaches 20-30 inches deep, also makes late-fall paving risky as freezing temperatures can heave and damage new pavement.

Understanding Costs for Parking Lot Overlays

Project costs can vary significantly based on size, condition, and scope. Below are general price ranges to help frame your budget.

  • Small Lot Resurfacing (e.g., 5,000 - 10,000 sq ft): $2.00 - $4.00 per square foot.
  • Large Lot Resurfacing (e.g., 20,000+ sq ft): $1.50 - $3.00 per square foot. Economies of scale often reduce the per-square-foot cost for larger projects.
  • Striping & Markings: After resurfacing, re-striping is essential. Costs range from $0.50-$0.75 per stall for simple layouts to $1.00-$2.00 per stall for complex layouts with symbols and custom markings 9.

Key Cost Factors: The final price depends heavily on the amount of base repair needed, the depth of milling required, current asphalt material costs, and the complexity of site logistics and drainage work.

Summary of Key Considerations

StepFocusKey Consideration for South Jordan
PreparationPermitting & EngineeringMust meet South Jordan City & APWA specifications 10 11
Weather50°F+ and Dry GroundAvoid late fall/winter due to freezing temps and frost line 12 13
ProcessMilling + Overlay1.5 - 3 inches is the typical milling depth 14
Budget$1.50 - $4.00/sq ftVaries significantly by the extent of base repairs required 15 16

Frequently asked questions

Sources

Footnotes

  1. Parking Lot Resurfacing: Complete Cost Guide & Process [2025] - https://www.candcsuperseal.com/parking-lot-resurfacing-complete-cost-guide-process-2025/

  2. Asphalt Resurfacing - Morgan Pavement - https://morganpavement.com/services/resurfacing/

  3. Asphalt Paving | Parking Lot Paving | Utah - https://gopaveutah.com/services/asphalt-paving/

  4. CHAPTER 7 STREETS - SJC.Utah.gov - https://www.sjc.utah.gov/DocumentCenter/View/6213/Chapter-7-Streets

  5. 9-25-060: NUMBER AND TYPE OF PARKING SPACES: - https://codelibrary.amlegal.com/codes/draperut/latest/draper_ut/0-0-0-36870

  6. Chapter 1 Standard Notes - SJC.Utah.gov - https://www.sjc.utah.gov/DocumentCenter/View/6210/Chapter-1-Standard-Notes

  7. Landscape Inspection Process - SJC.Utah.gov - https://sjc.utah.gov/DocumentCenter/View/3399/LANDSCAPE-INSPECTION-PROCESS---PUBLIC

  8. How Weather Impacts Asphalt Curing & Your Timeline - https://www.alliedasphalt.com/how-weather-impacts-asphalt-curing-and-your-timeline.php

  9. Cost Calculator - Parking Lot Striping Pricing Salt Lake County - https://parkinglotstripingslc.com/pricing

  10. CONSTRUCTION STANDARDS AND SPECIFICATIONS - https://mccmeetingspublic.blob.core.usgovcloudapi.net/sojordanut-meet-07b530c0b6894b5980b6c53e53871efa/ITEM-Attachment-001-e483fbc3143c4fdbbed861b1b3f8d630.pdf

  11. CONSTRUCTION STANDARDS AND SPECIFICATIONS - https://sjc.utah.gov/DocumentCenter/View/528/Construction-Standards-and-Specifications-PDF

  12. Best Time to Pave Driveway | Seasonal Paving Guide - https://sspaving.com/blog/best-time-to-pave-driveway/

  13. 13-12-6: PARKING LOT AND RESIDENTIAL DRIVEWAY ... - https://codelibrary.amlegal.com/codes/westjordanut/latest/westjordan_ut/0-0-0-80123

  14. West Jordan 2026 Mill and Overlay Projects - Utah.gov - https://www.westjordan.utah.gov/overlay/

  15. A Complete Guide On Parking Lot Resurfacing - Ace Avant - https://www.aceavant.com/a-complete-guide-on-parking-lot-resurfacing/

  16. Parking Lot Resurfacing: Complete Cost Guide & Process [2025] - C&C Super Seal - https://www.candcsuperseal.com/parking-lot-resurfacing-complete-cost-guide-process-2025/