Logo of Tidy Parking
Hero background

Find the Best Parking Lot Resurfacing Contractors for Your Business

No obligation • Fast responses • Nationwide coverage

Search providers near you

Top Parking Lot Resurfacing Contractors in High Point, North Carolina Ranked

A parking lot resurfacing project is a strategic investment to restore a worn, cracked, or faded asphalt surface. This process, often called an overlay, extends the life of your pavement by 8-15 years, improving safety, curb appeal, and property value. For business and property owners in High Point, understanding the local process, costs, and regulations is key to a successful project. This guide explains what to expect and how to connect with qualified local contractors for your asphalt overlay needs.

What is Parking Lot Resurfacing?

Parking lot resurfacing is a comprehensive pavement restoration technique. It involves milling away the top 1.5 to 3 inches of deteriorated asphalt, making necessary repairs to the stable base below, and then installing a fresh, high-quality asphalt overlay 1. This is distinct from a full reconstruction, which digs much deeper, or simple sealcoating, which is just a protective coating. Resurfacing addresses surface-level issues like widespread cracking, weathering, and minor irregularities, providing a like-new driving surface without the extensive cost and downtime of a total replacement.

The primary goal is to restore functionality and safety while maximizing the lifespan of your existing pavement structure. A properly executed overlay can be a cost-effective solution for lots that are structurally sound but visually worn and in need of a renewal.

The Step-by-Step Resurfacing Process

A professional asphalt overlay follows a meticulous sequence to ensure long-lasting results. Here's what a typical project in High Point entails:

  1. Site Inspection & Assessment: A reputable contractor will first evaluate your existing lot. They assess drainage, base stability, and the extent of surface damage like cracks and potholes. This inspection determines if resurfacing is suitable or if more extensive base repairs are needed 2.

  2. Milling: A milling machine mechanically removes the designated top layer of old asphalt. This step creates a clean, level surface with the proper depth (usually 1.5-3 inches) to accommodate the new overlay and ensures proper drainage.

  3. Base Repairs: This is a critical phase. Any unstable areas in the sub-base are excavated and repaired with new aggregate and asphalt. Neglecting base repairs can lead to premature failure of the new overlay.

  4. Tack Coat Application: A thin layer of asphalt emulsion, acting as a "glue," is sprayed onto the milled surface. This tack coat is essential for creating a strong, permanent bond between the old base and the new asphalt layer 3 4.

  5. Asphalt Installation: Hot mix asphalt (HMA) is delivered, poured, spread, and meticulously compacted with heavy rollers. Proper compaction at the correct temperature is crucial for density and durability.

  6. Curing & Striping: The new asphalt needs 24 to 48 hours to cure and harden sufficiently for traffic. Once cured, contractors return to re-stripe parking spaces, re-paint handicap-accessible stalls, and apply fresh traffic arrows and symbols.

Understanding Costs for High Point Projects

The cost of parking lot resurfacing in North Carolina is typically calculated per square foot. For an overlay project, you can expect a range of $1.37 to $3.00+ per square foot 5 6. Several key factors influence where your project falls within this range:

  • Project Size: Economies of scale apply. A small lot (e.g., ~5,000 sq ft) will often have a higher cost per square foot due to fixed mobilization fees, potentially reaching $3.00-$6.00 per sq ft. A large lot (e.g., 20,000+ sq ft) usually benefits from a lower rate, often between $1.50 and $3.00 per sq ft 7 8 9.
  • Condition & Repairs: The need for significant base repair or extensive crack filling before the overlay can add to the project cost.
  • Asphalt Material Costs: Fluctuations in the price of oil and aggregates affect the price of hot mix asphalt.
  • Scope of Work: Additional services like new curb work, drainage improvements, or extensive landscaping reinstatement will increase the total price.

For comparison, here are typical costs for related pavement services in the region 10 11:

ServiceEstimated Cost (Per Sq Ft)
Resurfacing (Overlay)$1.37 - $3.00
Full Asphalt Replacement$4.00 - $10.00
Sealcoating$0.15 - $0.30
Patching/Repair$2.00 - $4.00

Find the perfect parking lot resurfacing contractors for your needs

Get personalized recommendations and expert advice

Permits and Regulations in High Point

Before starting any parking lot pavement project, it's essential to check local requirements. In High Point, resurfacing an existing commercial lot generally requires a permit.

  • Permit Type: You will likely need a Zoning Compliance Permit or a Commercial Permit 12 13.
  • Key Consideration - Right-of-Way: If your resurfacing work involves any area within the city's right-of-way (e.g., driveway aprons, sidewalks adjacent to the street), a separate Roadway Encroachment Permit is required. The commercial base fee for this permit is typically $150 14 15.
  • Standards: All materials and construction methods must comply with the NCDOT Standard Specifications for Roads and Structures 16.
  • Zoning Compliance: Parking lot designs must include proper drainage that does not flow onto public sidewalks and often require a buffer from the public right-of-way 17.

For the most accurate and current information, contact a High Point Permit Specialist at 336-883-3151 18.

Best Time of Year for Asphalt Overlays

Weather plays a significant role in the success of an asphalt paving project. In High Point's climate, the ideal seasons for resurfacing are Spring and Fall.

  • Temperature: Asphalt requires warm ground and ambient temperatures (typically consistently above 50°F) for proper compaction and curing. If it's too cold, the asphalt will cool too quickly, preventing adequate compaction and leading to premature raveling and cracking 19 20.
  • Moisture: Rain is the enemy of a paving project. It can saturate the sub-base, creating instability, and will halt the delivery and placement of hot mix asphalt. Reliable contractors monitor forecasts closely 21.
  • Summer & Winter: While summer paving is common, crews may work earlier in the day to avoid extreme heat. Winter is generally avoided due to cold temperatures, though winter base repairs can sometimes be performed in preparation for a spring overlay.

Planning for Business Operations

One of the advantages of resurfacing over full reconstruction is relatively minimal downtime. A typical overlay project for an average commercial lot can be completed in 1 to 3 days, allowing businesses to reopen quickly. Proper planning with your contractor is essential. Discuss work hours, staging areas for equipment, and how customer and employee access will be managed during the milling and paving phases. Clear communication with your tenants or customers about temporary closures will ensure a smoother process.

Choosing a Local Contractor

Selecting the right professional is the most important step. Look for a licensed and insured contractor with specific experience in commercial parking lot resurfacing in the Piedmont Triad area. Ask for references and examples of past projects similar in scale to yours. A trustworthy contractor will provide a detailed, written estimate that breaks down costs for milling, repairs, asphalt tonnage, compaction, and striping. They should also be knowledgeable about High Point's permit process and willing to handle or guide you through it.

Maintaining Your Newly Resurfaced Lot

After investing in a new overlay, protect it with a regular maintenance plan. Allow the new asphalt to cure fully (usually 6-12 months) before applying a quality sealcoat. Implement a routine of crack sealing to prevent water infiltration and schedule professional sweeping to keep debris and standing water off the surface. A well-maintained resurfaced lot can provide over a decade of reliable service.

Frequently asked questions

Sources

Footnotes

  1. Parking Lot Resurfacing: Complete Cost Guide & Process [2025] - https://www.candcsuperseal.com/parking-lot-resurfacing-complete-cost-guide-process-2025/

  2. Asphalt Paving Lot Resurfacing - Atlanta, GA - The Surface Masters - https://thesurfacemasters.com/asphalt-paving-lot-resurfacing-8-simple-steps/

  3. Parking Lot Seal Coating Costs for Asphalt : 2025 Pricing Guide - https://www.fixasphalt.com/blog/how-much-does-it-cost-to-sealcoat-an-asphalt-parking-lot

  4. Everything You Need To Know Before Resurfacing a Parking Lot - https://cpmsweeping.com/everything-you-need-to-know-before-resurfacing-a-parking-lot/

  5. North Carolina Parking Lots Costs & Prices - ProMatcher.com - https://parking-lots.promatcher.com/cost/north-carolina.aspx

  6. Cost of Asphalt Paving in Charlotte, NC - https://charlotteasphaltservice.com/cost-of/asphalt-paving

  7. Parking Lot Resurfacing: Complete Cost Guide & Process [2025] - https://www.candcsuperseal.com/parking-lot-resurfacing-complete-cost-guide-process-2025/

  8. Cost to Pave a Parking Lot Price Guide [2026 Data] | Angi - https://www.angi.com/articles/cost-to-pave-parking-lot.htm

  9. What is the cost of Parking Lot Repair in Asheville, NC? - https://ashevilleasphaltservice.com/asheville-nc-parking-lot-repair-costs

  10. Cost of Asphalt Paving in Monroe, NC - https://monroeasphaltservice.com/cost-of/asphalt-paving

  11. Cost of Parking Lot Repair in Charlotte, NC - https://charlotteasphaltservice.com/cost-of/parking-lot-repair

  12. Permit Types | High Point, NC - https://www.buildhighpoint.com/2980/Permit-Types

  13. Permits Required | High Point, NC - https://www.highpointnc.gov/2978/Permits-Required

  14. 1 January 17, 2014 Roadway Encroachment Policy Summary - https://www.highpointnc.gov/1767/Roadway-Encroachment-Policy

  15. City of High Point Development Fee Schedule - https://www.highpointnc.gov/DocumentCenter/View/24569/Fee-Schedule-Appendix-C-PDF

  16. 1 January 17, 2014 Roadway Encroachment Policy Summary - https://www.highpointnc.gov/1767/Roadway-Encroachment-Policy

  17. STANDARDS AND REQUIREMENTS FOR PARKING LOTS - https://codelibrary.amlegal.com/codes/darecounty/latest/dareco_nc/0-0-0-35006

  18. Permits | High Point, NC - https://www.highpointnc.gov/3011/Permits

  19. Step-by-Step Process of Parking Lot Sealcoating - https://asphaltcoatingscompany.com/blog/step-by-step-process-of-parking-lot-sealcoating/

  20. Paving Parking Lots - The Best Temperature - https://acplm.net/paving-parking-lots/

  21. Guide to Parking Lot Pavement Resurfacing in Raleigh, NC - https://blalock-paving.org/all-you-need-to-know-about-parking-lot-pavement-resurfacing/